When people think about the energy footprint of aviation, they think of aircraft. The CASCADE project, which ran from 2011 to 2015, started from a less obvious observation: the airport buildings themselves are very large energy consumers, and a good share of what they consume is wasted through faults that nobody notices.
This page explains the problem as the project framed it, then adds some present-day context of our own. Figures attributed to the project come from its former website and from the European Commission's CORDIS record; the explanations of how each fault wastes energy are written by Cascade.
Airports as energy users
The project website put a typical airport's electricity consumption at between 100 and 300 GWh a year, and compared this with the consumption of 30,000 to 100,000 households. Those two ranges are consistent with each other: dividing the energy by the number of households gives roughly 3,000 to 3,300 kWh per household per year in both cases.
The CORDIS article on the project, published in 2014, reported that heating, ventilation and air-conditioning (HVAC) account for around half of an airport's energy use. Lighting, baggage handling, lifts and escalators, IT and retail make up much of the rest. HVAC was therefore where CASCADE concentrated its effort.
A few features make terminals particularly demanding. Many operate around the clock or close to it. They contain spaces with very different needs, from cold baggage halls to densely occupied gate lounges and glazed concourses exposed to strong solar gain. And they are served by big central plant: chillers, boilers or cogeneration units, cooling towers and large air handling units (AHUs) that run for thousands of hours a year. Small inefficiencies in equipment of that size add up quickly.
Why the building management system does not catch it
Almost every large terminal already has a building automation or building management system (BAS/BMS). The project's argument was that these systems are designed to keep spaces comfortable and to raise alarms when something fails outright, not to judge whether plant is running efficiently. A chiller that runs at poor efficiency, or a heating valve that leaks while a cooling coil fights it, will often keep the space within its set-point range. No comfort complaint arrives, no alarm trips, and the waste continues.
The project's former website made exactly this point: the faults behind much of the wasted energy are seldom detected by existing BMS platforms. A 2013 conference paper by researchers at what was then the National University of Ireland Galway, one of the project partners, used a SWOT framework to examine how BMS platforms and dedicated fault detection and diagnosis (FDD) tools could be integrated. It is listed in our annotated guide to CASCADE publications.
A taxonomy of operational faults
The project listed the kinds of operational fault that it considered typical in airport buildings. The table below follows that list; the descriptions and energy explanations are our own.
| Fault type | What it looks like in practice | Why it wastes energy |
|---|---|---|
| Wrong time schedules | Plant runs at night or at weekends in areas that are empty | Fans, pumps and conditioning run for hours with no benefit |
| Simultaneous heating and cooling | A heating coil and a cooling coil in the same system both active | Energy is spent heating air and then removing the same heat |
| Control errors | Unstable loops, wrong sequencing, poorly tuned set-points | Equipment cycles or overshoots, running harder than needed |
| Manual overrides | A valve, damper or fan forced to a fixed position and forgotten | The system can no longer reduce output when demand falls |
| Uncalibrated sensors | A temperature or flow sensor drifting from the true value | Controls respond to false readings, over-heating or over-cooling |
| Poor maintenance | Fouled coils, clogged filters, slipping belts | Fans and pumps work harder to deliver the same duty |
| Unbalanced hydraulics | Some circuits starved of flow while others receive too much | Pumps are run faster to satisfy the worst-served zone |
| Plant too large or too small | Equipment sized for a load that never materialises, or overloaded | Oversized plant runs at poor part-load efficiency; undersized plant runs flat out |
Most of these faults share a common trait: the building still works. That is what makes them expensive. A fault that stops a system tends to be fixed within hours; a fault that merely degrades efficiency can persist for years.
Why airports are a harder case than offices
The general problem is not unique to airports, but terminals amplify it. Long operating hours mean that a scheduling fault costs more per day than it would in an office that closes in the evening. Multiple organisations, from the airport operator to airlines, handling agents and retailers, share the same buildings, which blurs responsibility for energy use. Operational priorities rightly favour safety, security and passenger flow over energy, so energy staff may have limited windows to intervene. And large central plant such as cogeneration or trigeneration makes it harder to see where energy is really going, because electricity, heat and chilled water are produced together.
One of the earliest scientific papers connected with the project, presented at the ICEBO 2012 conference in Manchester, reviewed EU airport energy interests and priorities in relation to ICT, energy efficiency and building operation. It is summarised in our publications guide.
How CASCADE responded
The project's answer was to combine automated FDD with a formal energy management system aligned with ISO 50001, so that every detected fault became an assigned, tracked action. It tested this at two Italian airports, Milan Malpensa and Rome Fiumicino. The method is described on our page about the CASCADE approach.
The same problem today
The faults in the table above have not gone away. What has changed since 2015 is the tooling. Continuous or ongoing commissioning, building analytics software and FDD rules running on top of BMS data have become more widely available, and many building operators now treat fault detection as an ongoing service rather than a one-off audit. The underlying challenge remains the one CASCADE identified: detecting a fault is only useful if someone is responsible for acting on it, and if the fix is verified afterwards.
For a practical, present-day treatment, see our articles on fault detection and diagnostics in building systems, heating, ventilation and air-conditioning in airport terminals and automated alarms for energy waste. The full set of archive pages is listed on the CASCADE project archive index.
References
- CASCADE project record (CORDIS). European Commission, CORDIS
- CASCADE – reducing energy use by airports. European Commission, CORDIS
- Archived 'Why CASCADE?' page (captured March 2016). Arquivo.pt
- Review of EU airport energy interests and priorities with respect to ICT, energy efficiency and enhanced building operation (ICEBO 2012). Zenodo
- A SWOT framework to investigate the integration between building management systems and fault detection and diagnosis tools (ICAE 2013). Zenodo