Rome Fiumicino (FCO): the CASCADE pilot site, 2013–2015

Rome Fiumicino as a CASCADE pilot: the Terminal 1 installation, the 2014 cooling-coil fault found by model-based diagnosis and the savings reported in 2015.

Published
Reading time
4 min
Byline
Cascade

Roma Fiumicino was the first of the two airports where the CASCADE project installed its fault detection and energy management tools. Its operator, Aeroporti di Roma (ADR), was a member of the project consortium. Sensors, meters and data loggers in Terminal 1 were installed and commissioned in December 2013, giving the project roughly fifteen months of live operation before it ended in March 2015.

Fiumicino also produced the project's best-documented single finding, a significant fault in an air handling unit identified in June 2014, and its largest reported savings potential. This page summarises the historical record. Figures describing the airport date from around 2010 to 2012 and are given as the project stated them.

The airport as the project described it

The project's site page described Fiumicino as Italy's busiest airport, with 36.3 million passengers in 2010, five terminals and around 190 destinations. It put the airport's electricity consumption at about 175 GWh a year.

According to the same page, the airport's thermal plant had a capacity of about 87 MW thermal and included a cogeneration unit of about 25.6 MW electrical and 15 MW thermal. Air handling units were supplied by district heating together with both compression (electric) and absorption chillers.

The page recorded that Fiumicino held Airport Carbon Accreditation at the "optimisation" level at the time, and listed measures already taken: tuning of HVAC schedules, lighting upgrades including a move from T8 to T5 fluorescent tubes and LED taxiway lights, and switching off information displays when parts of the terminal were quiet.

Installation at Terminal 1

The project's news items give the sequence. A tender for sensors, meters and data loggers was won by an installation firm based in Padua, and a kick-off meeting took place at Fiumicino in August 2013. The installation in Terminal 1 was completed and commissioned in December 2013, about five months before Malpensa.

Once commissioned, the installation fed the project's tools with live data from Terminal 1, combining readings from the airport's building management system with those from the new instruments.

The June 2014 cooling-coil fault

In June 2014 the project reported that Fraunhofer ISE, the coordinator, had found a significant fault in the cooler (cooling coil) of an air handling unit at Fiumicino, using a fault detection method based on qualitative models. A short technical note on the finding, dated 16 June 2014, was published on the project website.

What follows is Cascade's general explanation of the technique, not a description of the specific unit.

A conventional model-based FDD approach builds a numerical model of a component and compares predicted and measured values. That requires detailed parameters, which are often unavailable for plant that has been in service for years. A qualitative approach instead describes behaviour in terms of states and directions: if the valve opens, the supply-air temperature should fall; if the fan stops, airflow should drop to zero. Measurements are mapped onto these qualitative states, and combinations that the model says should never occur point to a fault. The appeal for large buildings is that such models can be set up without detailed commissioning data.

The method was later described in a 2015 paper by Thorsten Müller, Kai Kruppa, Gerwald Lichtenberg and Nicolas Réhault, "Fault detection with qualitative models reduced by tensor decomposition methods", published in IFAC-PapersOnLine. Its citation is given in our publications guide.

Final results

The project's final newsletter, published in July 2015, reported the following annual savings potential for Terminal 1:

Energy streamSavings potential reported (per year)
Electricity363 MWh
Heat691 MWh
Chilled water527 MWh
Estimated valueabout EUR 90,000
Estimated CO₂ reductionabout 230 tonnes

These are the largest figures the project reported from either pilot. The newsletter described the savings potential at both airports as "up to 20%" on the systems studied, with a payback of less than two years.

An earlier estimate in a CORDIS news article of July 2014, given while the pilot was still running, quoted roughly 500 MWh, 3,500 tonnes of CO₂ and EUR 70,000 a year. Those three numbers are not consistent with one another, since 500 MWh of energy could not account for 3,500 tonnes of CO₂, so we rely on the later, more detailed newsletter figures. Like all pilot results, they are estimates of what correcting the identified faults would achieve rather than long-term measured savings.

Fiumicino on camera

In January 2014 the Euronews science series Futuris broadcast a report on the project titled "Planes go up, costs go down", filmed partly at Fiumicino. The project website carried a page about the film. Our project timeline places it alongside the project's other outreach.

Fiumicino today

The passenger figure, plant capacities and accreditation level above belong to the period of the project. Fiumicino's traffic, terminals and energy infrastructure have changed considerably since then, and current information should be taken from the operator's own publications. Airport Carbon Accreditation has also added higher levels since the project's time, so the historical "optimisation" level is not a guide to the airport's present status.

Further reading on Cascade

For present-day context, see our articles on fault detection and diagnostics in building systems, heating, ventilation and air-conditioning in airport terminals and airfield lighting and the switch to LEDs. The companion pilot page covers Milan Malpensa, and all archive pages are listed on the CASCADE project archive index.

References

  1. CASCADE project record (CORDIS). European Commission, CORDIS
  2. Archived Fiumicino pilot page (captured March 2016). Arquivo.pt
  3. CASCADE Newsletter No. 6, July 2015 (archived copy). Arquivo.pt
  4. CASCADE – reducing energy use by airports. European Commission, CORDIS
  5. Fault detection with qualitative models reduced by tensor decomposition methods (IFAC-PapersOnLine, 2015). IFAC-PapersOnLine