CASCADE timeline 2011–2015: from kick-off to final review
A dated timeline of the CASCADE project from its October 2011 start to the 2015 final review: pilot installations, papers, outreach and the results it reported.
The CASCADE project's website kept a running list of news items from late 2012 until the project closed. This page rewrites that record, together with dates from the project's papers, newsletters and the European Commission's CORDIS database, as a single timeline in our own words.
Where sources disagree, we say so. Where the original news gave only a month, we give only a month. Links lead to the relevant archive pages for more detail.
2011–2012: start-up and groundwork
- 1 October 2011. The project begins, under FP7 grant agreement 284920, with Fraunhofer ISE as coordinator and a planned duration of 42 months. See the project profile.
- January 2012. First project newsletter issued. It is one of the few project documents hosted on CORDIS.
- February 2012. Project brochure published, also now on CORDIS.
- October 2012. Fraunhofer ISE issues a press release about the project, which is picked up by trade and science news outlets in Germany, Switzerland and the UK, among others.
- 23–26 October 2012. NUI Galway researchers present a review of EU airport energy interests and priorities at the ICEBO 2012 conference in Manchester. See the paper's entry.
- November 2012. Second newsletter.
- December 2012. The project reports the start of its demonstration phase.
2013: tools and installations
- 16–19 June 2013. Paper on integrating fault detection and diagnosis with ISO 50001 presented at CLIMA 2013 in Prague.
- 1–4 July 2013. Paper on a SWOT framework for integrating building management systems with FDD tools presented at ICAE 2013 in Pretoria.
- July 2013. The project reports the release of its first online tool. Third newsletter issued.
- August 2013. A Padua-based installation firm wins the tender for sensors, meters and data loggers; the installation kick-off meeting is held at Fiumicino.
- 25–28 August 2013. Malpensa case-study paper on simulation in support of ISO 50001 and FDD presented at Building Simulation 2013 in Chambéry.
- October 2013. The project reports that FDD visualisation has been integrated into partner Enerit's ISO 50001 energy management software.
- 19 November 2013. First project webinar, with speakers from Fraunhofer ISE, Enerit, SEA and Aeroporti di Roma.
- December 2013. Installation at Fiumicino Terminal 1 completed and commissioned.
The project website also listed a paper at ICEBO 2013 by a Fraunhofer ISE author; we have not been able to confirm its exact date.
2014: the pilots in operation
- January 2014. Euronews broadcasts "Planes go up, costs go down" in its Futuris series, filmed partly at Fiumicino. Fourth newsletter issued.
- March 2014. The project is presented at Passenger Terminal Expo in Barcelona.
- 3–4 April 2014. Paper on EDVE, an energy diagnosis visualisation environment, presented at the CIBSE ASHRAE Technical Symposium in Dublin.
- 6 May 2014. Project board meeting in Belgrade, hosted by the Institute Mihajlo Pupin.
- May 2014. Installations at Malpensa completed and commissioned.
- June 2014. Fraunhofer ISE reports a significant fault in an air handling unit's cooling coil at Fiumicino, found with qualitative model-based fault detection. A technical note dated 16 June 2014 describes it.
- July 2014. CORDIS publishes an article on the project. Its savings estimate from that time is internally inconsistent and was superseded by the final figures (see 2015).
- 28–30 October 2014. Paper presenting the CASCADE methodology and tool given at World SB14 in Barcelona.
- November 2014. Fifth newsletter issued.
2015: results and close
- 13 March 2015. Joint workshop with the FP7 project S4ECoB at Malpensa. The project's news headline dated the event 19 March, but the body of the item, the invitation page and the draft agenda's filename all give 13 March, which we follow.
- 31 March 2015. The project ends.
- 6 May 2015. Final review meeting with the European Commission.
- July 2015. Sixth and final newsletter, reporting savings potentials of up to 20% at both pilot airports and a payback of less than two years. For Fiumicino Terminal 1 it gives 363 MWh of electricity, 691 MWh of heat and 527 MWh of chilled water a year (about EUR 90,000 and about 230 tonnes of CO₂); for the air handling units supplying Malpensa's Satellite A, 126 MWh, 309 MWh and 262 MWh respectively.
- 2015. Two further papers appear: one in IFAC-PapersOnLine on fault detection with qualitative models, and one in Advanced Engineering Informatics on an ontology-based facility data model. Citations are in the publications guide.
- 23 October 2015. Fraunhofer ISE presents the project's results at the Bauallianz forum in Munich.
After the project
The project website remained online, essentially unchanged, until at least March 2020. After the domain lapsed it was used by unrelated parties, including for gambling spam between 2023 and 2025. Cascade, an independent publication, now occupies the domain and maintains this archive from public records; it has no connection with the former consortium. Our About page explains the domain's history in more detail.
What the timeline shows
This closing section is Cascade's own reading of the record.
Two patterns stand out. The first is how long the practical work took to reach the buildings. The project began in late 2011, but the first pilot installation was commissioned only in December 2013, more than two years in, and the second in May 2014. That left roughly fifteen months of live operation at Fiumicino and about ten at Malpensa before the project closed. Procurement, installation and commissioning in operational airports are slow, and research projects with fixed end dates feel that acutely.
The second is that the most concrete technical result, the cooling-coil fault at Fiumicino, came only after several months of live data. Fault detection depends on observing plant across varied operating conditions, which is another argument for running such systems continuously rather than as one-off studies.
Further reading on Cascade
For present-day context, see our articles on energy efficiency in airports, predictive maintenance for building services and the history of EU energy research programmes. All archive pages are listed on the CASCADE project archive index.
References
- CASCADE project record (CORDIS). European Commission, CORDIS
- Archived CASCADE news page (captured March 2016). Arquivo.pt
- Archived page on the Euronews Futuris film (captured March 2016). Arquivo.pt
- Archived workshop page, Malpensa, 13 March 2015. Arquivo.pt
- CASCADE Newsletter No. 6, July 2015 (archived copy). Arquivo.pt
- CASCADE – reducing energy use by airports. European Commission, CORDIS