CASCADE project profile: aims, scope and key data (2011–2015)

Key facts on CASCADE, an EU FP7 research project (grant 284920, 2011–2015) coordinated by Fraunhofer ISE on ICT for energy-efficient airport terminals.

Published
Reading time
5 min
Byline
Cascade

CASCADE was a European research project that ran from October 2011 to March 2015. Its full title, as recorded by the European Commission, was "ICT for Energy Efficient Airports". The idea behind it was simple to state and hard to deliver: large airport terminals waste a measurable share of the energy they buy because faults in heating, ventilation and air-conditioning plant go unnoticed, and the project wanted to find those faults automatically and turn them into concrete actions for the people who run the buildings.

This page sets out the basic facts of the project as they appear in the public record, chiefly the Commission's CORDIS database and the project's own website as preserved in web archives. The project website lived at this address until about 2020. Cascade, the publication that now occupies the domain, is independent of the former consortium; the page below is our own summary, not a document of the project.

Key data at a glance

ItemDetail (according to the CORDIS record unless noted)
Acronym and titleCASCADE: ICT for Energy Efficient Airports
Grant agreement284920
ProgrammeSeventh Framework Programme (FP7), "Cooperation" specific programme, ICT theme
CallFP7-2011-NMP-ENV-ENERGY-ICT-EeB
TopicEEB-ICT-2011.6.4, ICT for energy-efficient buildings and spaces of public use
Funding schemeCollaborative project
Start and end1 October 2011 to 31 March 2015 (42 months)
Total costEUR 3,874,591
EU contributionEUR 2,599,866
CoordinatorFraunhofer-Gesellschaft, through the Fraunhofer Institute for Solar Energy Systems (ISE), Freiburg, Germany
ConsortiumNine organisations from Germany, Ireland, Italy and Serbia
Pilot sitesMilan Malpensa and Rome Fiumicino airports, Italy
StatusClosed; the project's final review with the Commission took place on 6 May 2015, according to its last newsletter

Two details are worth noting. First, the CORDIS news article published in July 2014 describes CASCADE as a "three-year" project, but the official duration was 42 months. Second, the CORDIS record also displays an unlabelled figure of EUR 1,274,725. It is not explained, but it equals the difference between the total cost and the EU contribution; the EUR 2,599,866 contribution given above is the one that matches the sum of the individual partner shares listed on CORDIS. The partner breakdown is on our consortium page.

The CORDIS article names Nicolas Réhault, head of the building performance optimisation group at Fraunhofer ISE, as the project coordinator.

What the project set out to do

The project's abstract, as summarised on CORDIS and on its former website, combined several aims into one programme of work:

  • Facility-specific energy action plans. Rather than offering generic advice, CASCADE aimed to give airport energy managers action plans derived from measurements taken in their own buildings.
  • Fault detection and diagnosis (FDD) as the foundation. Automated FDD would continuously check how plant was performing and flag deviations from expected behaviour.
  • A link to formal energy management. Detected faults were to be fed into an energy management action system aligned with EN 16001 and its successor, ISO 50001, so that each problem became an assigned task with a responsible person.
  • A technology-neutral layer. The tools were meant to sit on top of whatever building automation an airport already had, rather than replacing it.
  • A measurement framework and a minimal data set. The project proposed defining the smallest set of measurements needed to benchmark equipment and user behaviour, so that the approach could be repeated elsewhere without heavy new metering.

The way these pieces fitted together is explained in more detail on our page about the CASCADE approach.

Scope: why airport terminals

The project's call topic covered energy-efficient buildings and "spaces of public use", and airport terminals are an extreme example of that category. They operate for long hours, often around the clock; they combine very different spaces, from baggage halls to retail areas and gate lounges; and they rely on large central plant for heating, cooling and ventilation. The CORDIS article reported that heating, ventilation and air-conditioning account for around half of an airport's energy use, which is why the project concentrated on HVAC systems.

The keywords listed on the project's profile page reflected this focus: airport terminals, HVAC, energy action plans, building energy management systems, ISO 50001, fault detection and diagnosis, cogeneration and interoperability.

The project website also stated that ACI EUROPE, the association of European airport operators, supported the proposal as a route for spreading the results to around 400 of the roughly 500 airports in the EU. ACI EUROPE was not a member of the consortium, and we have found no public record of what that support involved in practice.

Targets and reported outcomes

CASCADE set itself two headline targets on the systems it addressed: a 20% reduction in energy use and associated CO₂ emissions, and a return on investment within three years.

The project's final newsletter, issued in mid-2015, reported savings potentials of "up to 20%" at both pilot airports and a payback of less than two years for the solution. It also gave detailed figures for the specific systems studied at each airport, which we reproduce, with attribution, on the Malpensa and Fiumicino pilot pages. Readers should note that these are savings potentials identified by the project, not independently verified savings measured over a long period after the project ended.

Reading the record today

Several things have changed since CASCADE finished, and they affect how the project should be read.

The Seventh Framework Programme covered the years 2007 to 2013 and was followed by Horizon 2020 and then Horizon Europe. FP7 projects such as CASCADE are now closed, and CORDIS remains the authoritative public record of what was funded, who took part and which documents were formally delivered. Our article on the history of EU energy research programmes explains how these programmes fit together.

The energy management standard the project referred to has also moved on. EN 16001, the European standard current when the proposal was written, was replaced by the international standard ISO 50001, first published in 2011, and ISO 50001 itself was revised in 2018. The underlying logic of planning, acting, checking and improving is unchanged, which is why the project's central idea, linking fault detection to a managed system of actions, still reads as current.

Finally, the website that once presented the project no longer exists in its original form. After the domain lapsed, it was used for some years by unrelated parties. The pages in this archive are a fresh, documented account written from public sources, and they deliberately avoid reusing the original text, logos or partner branding.

Further reading on Cascade

For present-day context on the themes of this project, see our guides to ISO 50001 and energy management systems, fault detection and diagnostics in building systems and energy efficiency in airports. The full list of archive pages is on the CASCADE project archive index.

References

  1. CASCADE project record (CORDIS). European Commission, CORDIS
  2. CASCADE – reducing energy use by airports. European Commission, CORDIS
  3. Archived CASCADE project profile page (captured March 2016). Arquivo.pt
  4. CASCADE methodology and tool: applied ICT for energy efficient airports (World SB14). Zenodo