The CASCADE approach: fault detection linked to ISO 50001 action plans

How the CASCADE project combined measurement-based fault detection with an ISO 50001 energy management action system, and what its final toolkit included.

Published
Reading time
5 min
Byline
Cascade

The CASCADE project's central proposition was that finding faults in building systems and managing energy formally are two halves of the same job, and that airports would save more energy if the two were joined. Automated fault detection tells you what is wrong; an energy management system makes sure someone fixes it, records the fix and checks the result.

This page describes how the project set out to connect those halves between 2011 and 2015, based on its former website, its final newsletter and the papers its partners published. Explanatory passages on how the techniques work in general are Cascade's own and are marked as such.

Two ideas joined together

The first idea was fault detection and diagnosis (FDD): software that compares measured behaviour of plant, such as air handling units, chillers or heating circuits, against what it should be doing, and flags deviations early and automatically. The project website described the purpose of FDD in those terms: catching faults sooner than manual inspection would, and without depending on someone happening to look at the right trend log.

The second idea was a formal energy management system. When the project was proposed, the relevant European standard was EN 16001; it was replaced by the international standard ISO 50001, first published in 2011, around the time the project began. Both are built around a cycle of planning, doing, checking and acting, with documented responsibilities and regular review.

CASCADE's contribution was to make FDD results the input to that cycle. A 2013 paper by project partners, presented at the CLIMA 2013 congress in Prague, addressed exactly this integration of FDD with ISO 50001 and with the operation and maintenance of HVAC systems.

A layer on top of existing automation

The project described its approach as measurement-based and technology-neutral. In practice this meant two things.

First, the tools would not replace an airport's building automation. They would read data from the existing BAS/BMS and from additional meters and sensors where needed, and run their analysis separately. This mattered for airports, where control systems are large, safety-relevant and often supplied by several vendors over many years.

Second, the project aimed to define a measurement framework, including a minimal data set: the smallest collection of measurements needed to benchmark equipment and user behaviour reliably. A minimal data set lowers the cost of applying the method to another building, because it tells the operator which measurements are essential and which are optional.

From fault to action

According to the CORDIS summary and the project's own pages, the output of CASCADE was intended to be a facility-specific energy action plan. Each detected fault would be translated into an action, linked to the person responsible for carrying it out and tied to the relevant requirements of the ISO standards, all managed through a web portal.

One of the partners, Enerit, developed ISO 50001 energy management software, and the project's news reported in October 2013 that FDD visualisation had been integrated into that software. The portal was therefore the point where the engineering analysis met the management system.

To see why this matters, consider how a fault is usually handled without such a link (an illustrative sequence, not a description of either pilot airport):

  1. An engineer notices an odd pattern in a trend log, or an FDD tool raises a flag.
  2. The finding is mentioned in a meeting or an email, but no one owns it.
  3. Weeks later, the fault is still present, and the evidence has scrolled out of the log.

An action system replaces steps 2 and 3 with an assigned task, a deadline, a record of the fix and a check that consumption actually fell. That final verification step is the part most often skipped, and it is the part a standard such as ISO 50001 insists on.

Staged optimisation: the carpet-plot example

The project website illustrated the approach with carpet plots of a heating-circuit pump. A carpet plot (our explanation) is a grid in which each column is a day and each row an hour, with colour showing the value of a measurement; it makes schedules and anomalies visible at a glance.

In the example the project showed, the pump began by running 24 hours a day. Over roughly eight months it was brought to optimised operation in stages: first by correcting schedules and set-points, then by fixing hardware problems, and finally by tuning the system as a whole. We describe the example rather than reproduce the images. The sequence is a useful pattern in its own right: cheap control changes first, physical repairs second, system-level optimisation last.

The final toolkit

The project's final newsletter, issued in mid-2015, described the toolkit as it stood at the end of the project. It extracted data from the BMS/BAS, ran FDD continuously and presented the results through a web portal. Underneath, an airport ontology, a structured, machine-readable description of the buildings, systems and equipment, acted as the repository for static data and supported interoperability between the different software components. The project's links page also reported that this ontology had been contributed to a European Commission platform on energy efficiency semantics.

Several partner publications describe parts of the toolkit:

  • a 2015 journal paper in Advanced Engineering Informatics on an ontology-based facility data model for energy management, using Malpensa and Fiumicino as test beds;
  • a 2014 paper on EDVE, an energy diagnosis visualisation environment;
  • a 2013 paper on using building simulation to support ISO 50001 and FDD, with Malpensa as the case study;
  • a 2015 IFAC paper by Fraunhofer ISE authors on fault detection with qualitative models.

Full citations and links are in our guide to CASCADE publications. The results reported at the two pilot sites are on the pilot airports page.

What carries over today

Read in 2026, the CASCADE approach looks less unusual than it did in 2011, and that is to its credit. ISO 50001 has become the reference framework for organisational energy management, now in its 2018 edition. Building analytics products that run fault detection rules on BMS data are widely available, and several integrate with work-order or maintenance systems so that a detected fault becomes a ticket. The project's emphasis on a minimal measurement set and on ontologies also anticipated later interest in standard semantic models for building data.

What remains hard is the organisational part: making sure each flagged fault has an owner and that savings are verified. Our articles on ISO 50001, fault detection and diagnostics and measurement and verification of energy savings cover current practice. Other archive pages are listed on the CASCADE project archive index.

References

  1. CASCADE project record (CORDIS). European Commission, CORDIS
  2. Archived 'Our solution' page (captured March 2016). Arquivo.pt
  3. CASCADE Newsletter No. 6, July 2015 (archived copy). Arquivo.pt
  4. Integration of Fault Detection and Diagnosis with Energy Management Standard ISO 50001 and Operations and Maintenance of HVAC systems (CLIMA 2013). Zenodo
  5. Ontology-based facility data model for energy management. Advanced Engineering Informatics